国产成人久久精品二区三区牛,人妻在线无码一区二区三区,欧美高清videosfreeⅹ,欧美日韩第一区,新版天堂资源在线资源,国产免费网站看v片元遮挡,亚洲乱码一区二区三区成人小说 ,欧美另类videossexo高潮

      認證資料 Certification Data

      官網測試有限公司

      • 聯系人:測試線上
      • 官網地址:http://www.lcxyhbsb.com
      • 經營模式:制造商
      • 主營產品:播音與主持藝術,戲劇影視表演,廣播電視編導, 北京
      • 所在地:北京亦莊經濟技術開發區測試街122號
      • 供應產品:14
      進入官網
      當前位置:首頁>企業動態> Plastic coated steel pipe manufacturer

      Plastic coated steel pipe manufacturer

      發布時間:2020-07-09

      What are the welding requirements for plastic coated steel pipe manufacturer? The manufacturer of plastic coated composite steel pipe recommended that 150 mm long smooth pipe should be reserved at the joint of plastic coated steel pipe, so that the plastic coating film will not be burned during welding. After welding, plastic tape winding method, shrinkage band method or flame spraying method shall be used for anticorrosion treatment for welding joint and reserved 300 mm pipe end. The plastic anti-corrosion tape winding method is used to grind the welded joint of the welded steel pipe, and remove the dirt and welding residues on the surface of the reserved 300 mm non coated steel pipe. After polishing, a special adhesive for plastic tape is applied. Under proper heating or normal temperature, the plastic anti-corrosion tape with the same material as the plastic film of the steel pipe is tightly wound at the joint. When winding, each circle should Overlap 1 / 2. The connection methods and requirements of the inner plastic coated steel pipe are as follows: firstly, the flange shall be welded at both ends of the steel pipe, and the flange shall be welded firmly, and then coated with polyethylene. During the installation, the sealing gasket should be installed between the two flanges of the coated composite pipe, which can be pressed down with bolts. In addition, plastic coated steel pipe should be fixed, such as buttress, bracket and hanger, to ensure that the pipe will not produce axial direction under pressure or water hammer. When fixing, it should be considered that the pipeline will not be displaced under the action of pressure and deflection. For vertically installed pipes, the distance between two fixed points shall not be greater than 2m. During horizontal installation, the distance between the two fixed points shall be no more than 750mm when the nominal outer diameter of the coated composite pipe is less than 76mm, and it shall not be greater than 1100mm when the nominal outer diameter of the coated composite pipe is not less than 76mm. Word of mouth recommendation of plastic coated composite steel pipe manufacturers: adopt sand blasting chemical dual pretreatment, preheating, internal coating, external coating, curing, post-treatment and other processes. The internal and external plastic coated composite steel pipe is a high cost-effective product upgraded from traditional steel plastic pipe and galvanized pipe. The recovery of sales volume of plastic coated steel pipe for fire protection is mainly due to the impact of warmer infrastructure investment. Generally, the order of machinery used in the project commencement is excavator, crane, loader, heavy truck, tower crane, etc. Excavators and other large machinery is generally considered as one of the barometers of industrial economic investment activity. The upstream of its industrial chain is coal, steel and other energy industries. The internal and external plastic coated composite steel pipe is mainly divided into two types: inner plastic coated steel pipe and inner and outer plastic coated steel pipe. The coating materials are generally epoxy resin and polyethylene, and can also be customized according to customer requirements. The plastic coated steel pipe effectively solves the defects in the production and installation of steel plastic composite pipe in the past. When the inner plastic coated steel pipe is fixed with cement or brick buttress, the pipe can be built in the buttress. When support, bracket and hanger are used for fixing, U-shaped or other type pipe clamps shall be set in pipe or pipe fittings. As the pipe surface is smooth, in order to prevent the pipe clamp from sliding, rubber pad shall be placed between the pipe surface and the pipe clamp, and the pipe shall be tightened with screws to prevent its sliding, and then the pipe clamp shall be firmly connected with the buttress, bracket and bracket through bolts, etc. The inner plastic coated steel pipe can also be installed according to the user's drawing. When the construction drawing cannot be provided, the special pipe connector can be designed and made for the user to connect with the mining pipe material or with the seamless steel pipe through the fast pipe clamp. During the installation of inner plastic coated steel pipe, the warning line on the pipe must face to the outside to form a line to show warning. Plastic coated composite steel pipe manufacturers recommend that the inner surface of the plastic coated steel pipe is smooth, with small flow resistance, flow rate, and no scaling, and is not easy to breed microorganisms, which can fully flow and use effect, save energy and environmental protection; and the plastic coated steel pipe has excellent chemical corrosion resistance, water resistance and solubility resistance, which can solve the corrosion of water transmission, buried pipeline and acid, alkali and salt on fire fighting pipeline, which will be large The service life of large pipeline can reach more than 50 years or more!

      主站蜘蛛池模板: 日韩人妻无码一区2区3区里沙| 成全我在线观看免费第二季| 少妇熟女淫荡丰满| 亚洲中文字幕乱码免费播放| 中文字幕精品亚洲二区| 亚洲日产2021三区在线| 性色欲情网站iwww| 人妻有码av中文字幕久久琪| 熟女少妇高潮免费视频| 亚洲中文字幕在线第二页| 中国国语毛片免费观看视频| 国产成人午夜福利院| 精品中文字幕一二三四区人妻| 亚洲精品日本| 任你躁国产自任一区二区三区| 成人午夜视频免费看欧美| 一区二区三区在线视频免费观看| 美女极度色诱视频国产免费| 麻豆国产高清精品国在线| 手机免费在线观看av网站| 长治市| 国产成人精品亚洲午夜| 国产精品午夜剧场免费观看| 国产AV无码专区亚洲精品网站| 国产国拍亚洲精品永久69| 国产精品三级av一区二区| 国产成人av在线免播放观看更新| 女人下边被添全过视频的网址| 女人被躁到高潮嗷嗷叫免费软| 国产高清女人对白av在在线| 中文字幕无码久久一区| 亚洲日韩av一区二区三区四区| av国产熟妇露脸在线观看| 亚洲一区二区三区在线观看播放| 一区二区三区福利导航| 国产精品三级一区二区按摩 | 国产精品白浆无码流出在线看| 国产精品中文字幕自拍| 91精品日本久久久久久牛牛| 在线观看网址你懂的| 亚洲中文字幕日韩精品|